House for 2 architects | Toledano+Architects
Toledano+Architects ,Release Time2026-05-11 10:42:00
Project : House for 2 architects
Architect: toledano + architects
Completed in : 2023
Surface : 100m2
Location : Paris, France
Program: renovation/ private apartment
Engineer office : Bet Buchet
Photographer
Photo Credits: Romain Ricard
Copyright Notice: The content of this link is released by the copyright owner Toledano+Architects. designverse owns the copyright of editing. Please do not reproduce the content of this link without authorization. Welcome to share this link.
House for 2 architects is the renovation of an apartment from the 19th century in front of the Luxembourg garden in the latin quarter of Paris.
© Romain Ricard
© Romain Ricard
Because the apartment is on the 5th floor, the views are very impressive and we wanted to highlight that quality. In a dense city like Paris, light is one of the main elements to enhance.
© Romain Ricard
© Romain Ricard
The original layout was very partitioned, with lots of small mono oriented rooms.
© Romain Ricard
© Romain Ricard
The idea was to open up the plan in order to have double exposure, east to west and be able to see the sun path from morning to night. In order to achieve that, we had to break a 50cm wide bearing wall.
© Romain Ricard
© Romain Ricard
The metal beam used to reinforce the structure was highlighted in pale green as a reminder of what was there before.
© Romain Ricard
© Romain Ricard
The apartment is designed for a family of 4, with 2 small kids sharing a bedroom with bunkbeds and a bathroom, on their side of the apartment.
© Romain Ricard
© Romain Ricard
The space is divided in 3 parts:
1: The main living space that includes a kitchen, dining room , living room and a home office
2: The parents’ suite
3: The children suite, on opposite sides.
© Romain Ricard
© Romain Ricard
The day and night spaces are separated with a long continuous walnut wood element from east to west that contains and hides the laundry, storage, the bookcase and a home cinema.
© Romain Ricard
© Romain Ricard
In the main area, the home office is equipped with a circular felt curtain in order to be able to close the space, and even make it a 3rd bedroom when needed. The felt helps isolate from the noise. When opened, the space enables to host large diner parties.
© Romain Ricard
© Romain Ricard
In terms of materials, all the walls were covered with natural lime, because of its benefits for the quality of the air, the isolation as well as the warm atmosphere it creates.
© Romain Ricard
© Romain Ricard
The kitchen was made with vibrated stainless steel as to reduce the fingerprints form the kids and resist through time. The kitchen island is made from travertine stone, in order to blend with the light parquet floor.
© Romain Ricard
© Romain Ricard
Walnut wood and stainless steel were used in the bookcase to bring some warmth into the space and also in the master bedroom.
© Romain Ricard
© Romain Ricard
In the kids bedroom, plywood was used to create the bunkbeds, closets, toys storage and bookcase in order to bring a playful and young environment.
Saint michel existing PLAN © Toledano+Architects
Saint michel PROJECT PLAN © Toledano+Architects


























C1 Central One | Bruzkus Greenberg
Apt-ZJY | c0w_studio
Rosso丨Naso
House for 2 architects | Toledano+Architects
798艺术区愿景规划 | Sasaki
这家不辣眼睛的KTV要做K歌界的科技担当丨N+1空间产品研究所
独白美术馆 | Wutopia Lab
Subscribe to our newsletter
Don't miss major events in the global design industry chain and important design resource companies and new product recommendations
Contact us
Report
Back to top





