cover
A1-1建筑设计,A1-1.10工业建筑,工厂,#工厂扩建

OROPOL Unit Industrial丨Em Paralelo

Em Paralelo ,Release Time2024-05-08 09:47:00

Project information

Sousa Marques engineering

OROPOL SA is a Swiss-owned company engaged in the industrial manufacturing and trading of watchmaking products, namely watch cases, bracelets and watch clasps, an activity that has already contributed and will continue to contribute to the region's economy, having settled in Castelo de Paiva, in March 2011.

From the beginning, there was an analogy between the Swiss Alps and the mountainous landscape that can be seen from the factory. This landscape is dematerializing and culminates in the Douro River. Given the unoccupied land to the east, this and the intention of expanding the existing Industrial Unit to this quadrant with a similar footprint to the existing building (2700m2) are being assessed. The main aim of this expansion project is to continue increasing production and the number of employees. In this way, it becomes a more autonomous Industrial Unit with more future capabilities.

The building is characterized by 2 floors and a technical basement, all of which have different characteristics. The existing basement floor: dedicated exclusively to production aid equipment that will not undergo any changes.

The current ground floor: internally has an entrance area with a hall, reception area and respective support spaces: meeting room and sanitary facilities for clients. The remaining area is organized as follows: lift room, stairwell with direct access to the outside, work area, floor -1 and access to the second floor. Adjacent to the vertical communications, male and female sanitary facilities to support the work space.

Finally, at the back there is a technical area where the technical equipment was placed. Therefore, through a covered and closed passage to the east, the same floor will be expanded, with a detached location from the current building by around 8 meters, allowing for outdoor leisure spaces and above all architecturally differentiating both buildings with distinct images.

This floor will also be dedicated to work with the inclusion of CNC machines, an increase in the area dedicated to sanitary facilities will be included to cover new employees, support offices, vertical communications surrounding a new freight elevator that will serve this floor and the new floor to design that will communicate equally with the existing one. At the rear of this expansion there will be an area dedicated to the technical area.

On the current floor, all areas will be maintained, namely, sanitary facilities, meeting room, social facilities, work area where there are polishing and parts washing machines. Through this floor, as mentioned above, there is a passage to the new expansion through a covered and closed walkway, which will give access to the new building, a space dedicated exclusively to work (polishing machines and washing machines), this floor is promoted with communications vertical to the lower floor through an interior staircase and freight elevator, sanitary facilities to support employees and finally, located at the back of the building there will be an exterior metal staircase, to comply with fire safety legislation as a form of evacuation in case of emergency.

With the image of the new building, the aim is to create a bolder and more distinct architectural approach between both buildings, yet friendly. This solution, with a more audacious character, with thermal concerns, taking aesthetic advantage of the blades that sometimes create moments of shadow and sometimes create moments of more tenuous and controlled light.

As in the existing building, the predominance of wood is a relevant point and affirms the building's image, hence the veneers of the new building seek a certain symbiosis with the current one, with the lacquering of the veneers alluding to wood. It is a more neutral building, especially on the interior, in which wood no longer exists and the structure materializes in a concrete structure painted in white.

In terms of exterior arrangements, there was a need for a complete redesign, both in terms of parking and in terms of making use of all possible space in the north and east quadrants. A gabion wall in the form of a terrace will be built across the entire back of the land, partially maintaining a slope as a green area and finally maintaining the existing metal fence on the “crest” of the land as the end of the limits next to the easement path to the adjacent properties.

Product gallery
a3ef9fbf5e74bd5b886d.jpg
fed2779d5f5467da5e83.jpg
b908e610e9b48618aecc.jpg
8a3aae3488448e1b9848.jpg
606b713cef84e48b0211.jpg
485c5e9eca64421afb74.jpg
900eec6dedf4a8d925b0.jpg
092a4ac0b554bbf8aa26.jpg
e5662ff2a464bc29b90f.jpg
8318ae078a0414da24be.jpg
bfc4044de934e528ae5c.jpg
d31821d6f7c4c19abaa5.jpg
902fa0e4979455ea053f.jpg
1d27b344d43485697e71.jpg
f9dcf50cbad47f49d113.jpg
974ec62d98c4dd9a5e16.jpg
6cb28d4b1f143008f6b0.jpg
e6aa921efbc477e8c6fc.jpg
0b7b0ff53824aea88081.jpg
231354771d94355b6683.jpg
d0a9a7dbdfa4416b7a86.jpg
8ab4aa91f8c4fc0bd13e.jpg
7c6d0f1d5114307b7d77.jpg
60f6fdac2a547a0976a9.jpg
0af3569fc334e10a468c.jpg
1a4a933e224453da4f17.jpg
8479c328d134ee7a7b44.jpg
c313db02b4a46ae88b2f.jpg
7a0cac1f1354ef39deaf.jpg
a622ce41adc434c8b40d.jpg
f63b9c79ce64e45b7091.jpg
cdb681f241546a991601.jpg
b81039da3d746168bdce.jpg
71d793f438f4461bbd53.jpg
d54e37da8a149f8b7b2c.jpg
3e9102802b94247bb01c.jpg
tag
#工厂扩建
Comment
More similar topics
A1-1建筑设计,A1-1.1居住建筑,公寓,#prefabrication

116 Public Housing Units in Madrid | UNIA ARQUITECTOS + FAU ARQUITECTOS

A1-1建筑设计,A1-1.1居住建筑,住宅综合体,# flexibility,#contemporary,#adaptability

208 AZUCARERA HOUSING | FRPO Rodriguez & Oriol

A1-1建筑设计,A1-1.1居住建筑,独栋别墅,#Weekend Retreat

Casa Jaguar | STarq Arquitetura

More projects published by the author
A1-1建筑设计,A1-1.10工业建筑,工厂,#工厂扩建

OROPOL Unit Industrial丨Em Paralelo

A1-1建筑设计,A1-1.4办公建筑,A1-1.10工业建筑,#建筑设计,#办公室,#工厂

BRADCO | Em Paralelo

Most popular
A1-3室内设计,A1-3.2餐饮空间,餐厅,#餐厅,#艺术空间,#甜品店

MOFUN

A1-3室内设计,A1-3.9体育休闲,会所,#现代性

The Peach Club丨Spaces and Design

A1-1建筑设计,A1-1.1居住建筑,独户住宅

House with 5 retaining walls | 武田清明建築設計事務所

Award(0)
Report(1)

Complete resource information

Contact us

Report

Back to top