
Sports Hall Wangen丨merz kley partner
merz kley partner ,发布时间2026-02-04 17:30:14
Architecture: Steimle Architekten | Stuttgart
Year of construction: 2024
Client: Town of Wangen im Allgäu & Ravensburg District
Country: Germany
Photos©Brigida Gonzalez
版权声明:本链接内容均系版权方发布,版权属于 merz kley partner,编辑版本版权属于设计宇宙designverse,未经授权许可不得复制转载此链接内容。欢迎转发此链接。
The new three-court sports hall in Wangen im Allgäu replaces a 1970s sports hall. This marks the first application of the sustainable construction guideline developed by the Ravensburg district at this site. The hall is constructed using a hybrid timber system, featuring a solid core and a timber structural frame, with recycled concrete utilized for both in-situ concrete works and all prefabricated components. The slender timber frame, lacquered in a light green finish both internally and externally, stands out distinctly against the wooden surfaces of the walls and floors.
The facade design also merits special attention, characterized by an alternation of solid and transparent panels and cladding of tapered vertical wooden slats. The entrance area, housing the cafeteria, opens generously onto the forecourt. By contrast, the main sports hall – which can be divided into three separate sports courts – and the sports facilities on the upper floor are screened from external view behind solid facade panels.







Club house Khamovniki 12丨QPRO
新开发银行总部大楼丨北玻股份
世界最大免税店,海南新地标丨北玻

Sports Hall Wangen丨merz kley partner
Gyeongdo 岛 - 以“自然”为动力的全新韩国可持续休闲目的地

Improvement of the embankment in the area of the Pavshinskaya Poyma. The first stage丨Basis architectural bureau
谷歌开发者社区丨不为变现,只为Coding而生
订阅我们的资讯
切勿错过全球大设计产业链大事件和重要设计资源公司和新产品的推荐
联系我们
举报
返回顶部





